Feature #2166

Add total costs for the sub-tab "Schedule" under tab "Order and Schedule"

Added by Luis Gustavo do Valle Bastos over 8 years ago. Updated over 8 years ago.

Status:
Feedback
Priority:
Urgent
Target version:
Start date:
09/10/2016
Due date:
01/13/2017
% Done:

0%


Description

- Include a separator between the group of accelerated orders and the group of regular orders. It could be a line or space.

- Include the total cost at the bottom of each group (splitted with separator) adding up the "Cost of order" value of each order grouped.

- Name the labels as: "Total cost of accelerated orders:" and "Total cost of regular orders:" (with the two dots at the end).

- Include a grand total at the very bottom of the screen (separated from the total cost of the regular orders) adding up the total costs of each group as: "Total cost of all orders:" (with the two dots at the end).

History

#1 Updated by Oleksii Kurasov over 8 years ago

  • Status changed from New to Feedback

We have this data on previous tab

#2 Updated by Andualem Oumer over 8 years ago

This has not been done yet.

#3 Updated by Oleksii Kurasov over 8 years ago

  • Due date set to 01/13/2017
  • Status changed from Feedback to Resolved
  • Assignee changed from Oleksii Kurasov to Andualem Oumer

Moved to "Additional and total cost tab"

#4 Updated by Andualem Oumer over 8 years ago

  • Status changed from Resolved to Feedback

For now we keep the total under additional and total costs - it for now impossible to have total under schedule.